We couldn't have been more pleased with the work that Sean did on the bathroom. After the demo, there were many tedious things that needed to be done, including the installation of a fan (we never had one), the building of a wall, and a ton of tiling. It was crazy, but Sean and Harry worked steadily enough so that by the end of two weeks, the vast majority of the work was done.
No comments:
Post a Comment